News & Press
TDI-BROOKS INCREASES VESSEL CAPACITY AND WELCOMES R/V NAUTILUS
TDI-Brooks increases its vessel capacity by adding a 75-meter DP2 vessel, R/V NAUTILUS, to its fleet. The market for subsea services remains strong, coupled with increased demand from clients and the need for increased capabilities. The vessel can potentially offer...
read moreTDI-BROOKS DEVELOPS NEW AUTO MINIVANE FOR ENHANCED SOIL TESTING
TDI-Brooks announces the successful development and testing of a new instrument, the Auto-Minivane. The Auto-Minivane instrument is a self-contained, stand-alone miniature vane shear testing device that can be used in a 0.5 m vertical-stroke format by an onshore or...
read moreTDI-BROOKS AWARDED SHALLOW WATER GEOTECHNICAL CORING PROJECT OFF US EAST COAST
Avangrid has awarded TDI-Brooks a shallow water geotechnical site investigation survey at block OCS-A-0508 also known as Kitty Hawk Wind. The data collected will inform the design of the export cable and inter-array packages. The scope of work includes utilizing a...
read moreTDI-BROOKS INTERNATIONAL, INC. SUBMITS REPORT TO BOEM FOR DEEPWATER ATLANTIC HABITATS II – DEEP SEARCH
The report for Contract M17PC00009, issued by the U.S. Department of the Interior, Bureau of Ocean Energy Management [BOEM]), titled “Deepwater Atlantic Habitats II: Continued Atlantic Research and Exploration in Deepwater Ecosystems with Focus on Coral, Canyon and...
read moreTDI-BROOKS ADDS MANTA-200 CPT TO THEIR GEOTECHNICAL CAPABILITIES
Next month TDI-Brooks will be adding a Manta-200 CPT System to their geotechnical capabilities. The TDI-Brooks’ Manta-200 Cone Penetration Testing (CPT) system is suitable for almost any project in shallow water up to 150 meters. The Manta-200 represents the latest...
read moreTDI-BROOKS AWARDED SIXTH OFFSHORE WIND PROJECT ON THE US EAST COAST
TDI-Brooks last week was awarded a geophysical, geotechnical and benthic sampling survey campaigns to study seabed conditions within the project lease area and potential export cable corridors off the US East Coast. The data collected will help determine safe and...
read morePAUL WALKER WILL BE LEADING TDI’S GEOTECHNICAL, GEOCHEMICAL, AND ENVIRONMENTAL LABS AS DIRECTOR OF LABORATORY OPERATIONS
Paul began his career at Humble Geochemical where he was tasked with method development, instrument maintenance, and general lab and project management. He then joined Baseline Resolution where he continued developing and optimizing specialized pyrolysis and...
read moreSarah Rittenhouse joins TDI-Brooks as Project Manager
Sarah Rittenhouse recently joined TDI-Brooks in a Project Management role. Sarah brings over 15+ years of experience as a Seismic Processor, Field Program Manager, Senior Geologist and Party Chief conducting Geotechnical and Geophysical operations. She will add vast...
read moreTDI-BROOKS WELCOMES SENIOR ENVIRONMENTAL SCIENTIST CYNDA MAXON TO THEIR TEAM
Cynda Maxon has joined TDI-Brooks as a senior environmental scientist, broadening the company’s environmental capabilities and services. She has over 30 years of experience as a program manager, environmental chemist, field supervisor, and risk assessor encompassing a...
read moreTDI-BROOKS UPGRADES DEEPWATER MULTIBEAM TO EM304 MKI
In an effort to enhance mapping efficiency, TDI-Brooks upgraded the multibeam (MBES) system on their vessel RV Gyre from the Kongsberg Maritime EM 302 to the EM 304 MKI. The EM 304 MKI is the successor of the highly acclaimed EM 302 which provides an increase of 75%...
read moreContact Us
TDI-Brooks International, Inc.
14391 S. Dowling Road
College Station, TX 77845
Email: info@tdi-bi.com
Phone: +1 (979) 693-3446